top of page
Civil Architecture
Installation tracks the movement of a beam of sunlight rather than cast a shadow. Alphaplus looked over casting concrete foundation to completing detailed artworkon each Island. All works were done on the location except casting mould done fromour factory. Artwork was delivered in 2 week time. We associated with Black Engineering and The Aimes, organizers Islamic Binnale.
Project Gallery
bottom of page